Projects

ROB Projects

Sr NoBENEFICIARYNAME OF WORKNO OF BRIDGES COMPLETED
1Central RailwayDesign & Construction of ROB at Ch.5782 m Burudgaon – Walki village road in Ahmednagar – Narayandoh section bet. Km 00.000 to 15.001
2Central RailwayConstruction of (Afzalpur ROB) in lieu of level crossing No 83/B at km 565/6-7 on Solapur – Wadi section1
3Central RailwayConstruction of ROB in lieu of L.C Gate No 60 at Railways kms 468/7-8 in SUR – WD section between Solapur- Hotgi station.1
4DFCCILConstruction of ROB at Palghar at LC 481
5MCGMHancock semi through girder ROB having span of 63 m1
6Western RailwayFRERE ROB at Grant Road1
7Central RailwayWidening and Construction of ROB on Eastern Express Highway at Kopri.1
8DFCCILConstruction of ROB at Palghar at LC 421
9DFCCILConstruction of ROB at Palghar at LC 551
10Central RailwayConstruction of ROBs, Pipe line bridge, approaches, road work along with all ancillary works in connection with Proposed 3rd & 4th Lines between Kalyan & Badlapur stations1
11Mumbai Railway Vikas CorporationKALYAN LC 1A1
12Mumbai Railway Vikas CorporationAmbarnath MIDC ROB1
  TOTAL NO OF ROAD OVER BRIDGES COMPLETED =12

Other Projects

Sr NoBENEFICIARYNAME OF WORKNO OF COMPLETED WORKS
1Mumbai Railway Vikas CorporationConstruction of Badlapur Deck1
2Mumbai Railway Vikas CorporationConstruction of Khar Deck1
3Mumbai Railway Vikas CorporationConstruction of Borivali Deck1
4Mumbai Railway Vikas CorporationConstruction of Jogeshwari Deck1
5Mumbai Railway Vikas CorporationConstruction of Mira Road Deck1
6Mumbai Railway Vikas CorporationConstruction of Kandivali Deck1
7Mumbai Railway Vikas CorporationStructural strengthening of Andheri Deck1
8Mumbai Railway Vikas CorporationConstruction of Entire Ram Mandir Station1
9Mumbai Railway Vikas CorporationConstruction of Entire Nahur Station1
10Mumbai Railway Vikas CorporationConstruction and commissioning of stabling siding at Juinagar including construction of Bridge, Earthwork, Track linking, Construction of pathway, Ballast supply etc1
11Mumbai Railway Vikas CorporationDeck at JOS (South) along with elevated booking offices (SW&SE)2
  TOTAL NO OF WORK COMPLETED12

FOB Projects

Sr NoBENEFICIARYNAME OF WORKNO OF BRIDGES COMPLETED
1Central Railway Govandi – Extension of FOB towards west side 1
2Central Railway  Construction Fabrication and Errection of FOB at Nahur Station1
3Central Railway     Foot Over Bridge, Elevated Booking office at Kopar station , path way Circulating Area2
4Central RailwayMumbra – FOB 3.66 m wide towards Kalyan end1
5Mumbai Railway Vikas CorporationFoot Over Bridge at Dahanu Road, Umroli & Vaitarna for the running of EMU services4
6Central RailwayFOB’s at Vikhroli Station (CST  & Thane end) for Kurla   Thane PHASE I Project.2
7Central RailwayBhandup – A) Extension of Kalyan end FOB to connect Platform No 3 & 4 1
8Mumbai Railway Vikas CorporationExtension of Railway FOB at  KM 14.83  ( North of Bandra Platform) and middle FOB2
9Central RailwayFOB & Staircase at Chunnabhatti in connection with laying of Single goods line From Wadala to Kurla1
10Central RailwayA) Kurla -Replacement of Mumbai End FOB                        B) Tilak Nagar – Provision of New FOB at Mankurd End2
11Central RailwayFOB, COP, Platform and circulating area in Pen – Roha section in  Panvel – Pen Roha Doubling Project2
12Mumbai Railway Vikas CorporationNew FOB &  Extension of harbour line platform from 9 car to 12 car at BA & STC stations of Western Railway under MTP 2
13Mumbai Railway Vikas CorporationFOB Extension  of harbour  line platform from 9 car to 12 car at  Mahim  station of  Western  Railway ”2
14Mumbai Railway Vikas CorporationTrespassing Control measures including Deck at Borivali & Kandivali  and provision of Escalators    3
15Mumbai Railway Vikas CorporationTilak Nagar Foot Over Bridge at North end1
16Mumbai Railway Vikas CorporationFOB at Vadala  Road  &   King’s Circle  stations and P.Way works at Vadala Road station 2
17Central RailwayConstruction of a new FOB and dismantling of CST end FOB at Chunabhatti Station to facilitate BKC connector work of MMRDA. 1
18Mumbai Railway Vikas CorporationFOB at Oshiwara including elevated booking office  in connection with provision of new station at Oshiwara 1
19Mumbai Railway Vikas CorporationDeck at  JOS (South) along with elevated booking offices (SW&SE) 2
20Central RailwayVidhyavihar – Provision of 5m wide FOB along with over head booking office at1
21Western RailwayBorivali- Construction of 12m wide FOB at middle over platform No 1 to 6A and 3m wide FOB over platform No.1 to 4 & 5 at South end2
22Mumbai Railway Vikas CorporationElevated Platform at Sandhurst Road stations and P.Way works at CSTM station in connection with ‘running of 12 coach EMU trains on Harbour line’ of Central Railway1
23Mumbai Railway Vikas CorporationFOB at South end of Tilak Nagar Station1
24Mumbai Railway Vikas CorporationFOB at Middle of Jogeshwari Station1
25Central RailwayFOB at North end of GTBN Station for wadala 3rd line project1
26Central RailwayChunabhatti FOB1
27Mumbai Railway Vikas CorporationMahim Middle FOB1
28Mumbai Railway Vikas CorporationMahalaxmi FOB1
29Mumbai Railway Vikas CorporationMarine Lines FOB1
30Mumbai Railway Vikas CorporationGrant Road Middle and south FOB2
31Mumbai Railway Vikas CorporationMumbai Central North and South2
32Mumbai Railway Vikas CorporationFOB at Middle of Charni Road Station1
33Mumbai Railway Vikas CorporationMahim Midsection FOB under Midsection Tresspass control works.1
34Mumbai Railway Vikas CorporationNallasopara Midesction FOB under Midsection Tresspass control works.1
35Mumbai Railway Vikas CorporationAndheri FOB under Midsection Tresspass control works1
36Mumbai Railway Vikas CorporationFOB at Goregaon Middle & South FOB under Midsection TressPass control works2
37Western RailwayFOB at Lower Parel North along with elevated Booking office 1
38Western RailwayBandra Middle FOB1
39Western RailwayBhayandar FOB1
40Western RailwayFOB’s at North end of Bandra Station2
41Mumbai Railway Vikas CorporationVangani FOB1
42Mumbai Railway Vikas CorporationVitthalwadi FOB1
43Mumbai Railway Vikas CorporationDadar FOB1
44Central RailwayKarjat FOB1
45Mumbai Railway Vikas CorporationBadlapur FOB2
46Mumbai Railway Vikas CorporationKalyan – Karjat FOB3
47Mumbai Railway Vikas CorporationMankhurd FOB1
48Mumbai Railway Vikas CorporationVashind FOB1
49Mumbai Railway Vikas CorporationNeral FOB1
50Mumbai Railway Vikas CorporationMiraroad FOB – Middle1
51Mumbai Railway Vikas CorporationConstruction and commissioning of stabling siding at Juinagar including construction of Bridge, Earthwork, Track linking, Construction of pathway, Ballast supply etc1
52Mumbai Railway Vikas CorporationChunabhatti FOB1
53Mumbai Railway Vikas CorporationAmbivili FOB1
54Mumbai Railway Vikas CorporationKalwa FOB1
  TOTAL NO OF FOOT OVER BRIDGES COMPLETED  =76