Corporate profile
Engineering built for live railway environments
A civil engineering and structural-steel contractor with a long-standing focus on railway infrastructure in Mumbai and beyond.
Who we are
30+ years of railway steelwork
Sai Projects (Mumbai) Pvt. Ltd. (SPMPL) works as a civil engineering and fabrication contractor for Central Railway, Western Railway, Mumbai Railway Vikas Corporation (MRVC), DFCCIL and the Municipal Corporation of Greater Mumbai.
Our portfolio includes Road Over Bridges, Foot Over Bridges, elevated station decks, cover-over-platform structures, industrial sheds, pipeline bridges, track-related works and other structural steelwork. Steel structures we fabricate follow Railway or RDSO designs and are inspected by third parties as applicable.
We also built two complete suburban stations, Nahur and Ram Mandir. Nahur station now relieves crowding at neighbouring Mulund.
Mission
End-to-end delivery from one team
To provide end-to-end solutions by drawing on our network of resources, and to exceed customer expectations through sound design, technology, expertise and cost-effective practice. Our construction engineers bring that experience to every site.
How we work
- Fabrication, quality control, logistics, erection and site coordination handled as one chain.
- Work planned around operating lines, night blocks and restricted traffic windows.
- Inspection records kept for every girder, from raw material to final coating.
Milestones from our record
Works that define SPMPL
- Stations
- Construction of the entire Nahur station and the entire Ram Mandir station (MRVC).
- Station decks
- Khar, Borivali, Kandivali, Jogeshwari, Mira Road and Badlapur decks; structural strengthening of the Andheri deck.
- Landmark ROBs
- Hancock semi-through girder ROB, 63 m span (MCGM); Frere ROB at Grant Road (Western Railway); Kopri ROB widening on the Eastern Express Highway (Central Railway).
- Freight corridor
- Three ROBs at Palghar (LC 42, 48 and 55) for DFCCIL.
- Corridor upgrade
- Retracting of platform and slewing of tracks at Palghar for EMU services between Virar and Dahanu Road (Western Railway). The work was completed well within the expected time.
